Building age in Höri
Municipality in the canton of Zurich · FSO no. 60
Building register (GWR) export of September 2026, parcel data of July 2025.
Key figures
- Parcels with a building
- 528
- 514 of them with a known construction year
- Median construction year
- 1994Canton: 1977Switzerland: 1976
- Median building age
- 32 yearsCanton: 49 yearsSwitzerland: 50 years
- Built 1960 or earlier
- 13.8%Canton: 34.9%Switzerland: 32.5%
- Built after 2000
- 33.9%Canton: 21.4%Switzerland: 23.3%
About the building stock in Höri
The parcel data lists 528 parcels with a building in Höri. For 514 of them (97.3%) the federal building register (GWR) gives a construction year, taken from the newest building on the parcel. The median construction year is 1994, so the median parcel with a building is 32 years old. 13.8% of the parcels with a known year were built in 1960 or earlier and 33.9% after 2000. The largest period is 1981-2000 with 29.0%. For comparison, the median construction year is 1977 in the canton of Zurich and 1976 in Switzerland. 14 parcels with a building have no usable construction year and are left out of the shares.
Construction-year histogram
Parcels with a building by construction period, as a share of the 514 parcels with a known year. The periods are not equally long, so read the bars as shares of the stock, not as building activity per year.
- 6.2%before 1920: 6.2%, 32 parcels
- 1.6%1920-1945: 1.6%, 8 parcels
- 6.0%1946-1960: 6.0%, 31 parcels
- 23.3%1961-1980: 23.3%, 120 parcels
- 29.0%1981-2000: 29.0%, 149 parcels
- 10.3%2001-2010: 10.3%, 53 parcels
- 16.7%2011-2020: 16.7%, 86 parcels
- 6.8%2021 and later: 6.8%, 35 parcels
Building age distribution
The same parcels grouped by the age of their newest building in 2026.
- 66 years or older (built 1960 or earlier)13.8%71 parcels
- 46 to 65 years (built 1961-1980)23.3%120 parcels
- 26 to 45 years (built 1981-2000)29.0%149 parcels
- Up to 25 years (built 2001 or later)33.9%174 parcels
How to read these figures
The parcel data links every parcel to the federal building register (GWR). A parcel counts once, with the construction year of its newest building. Where the register gives only a construction period, the middle of the period is used.
The figures count parcels with a building, not individual buildings. A parcel with several buildings counts once, and a parcel without a building is not counted.
Building age is 2026 minus the construction year. Every share divides by the parcels with a known construction year.
See it on the map
roots colors every parcel by construction year, from deep red for the oldest buildings to pale cream for the newest.
Open the roots map in HöriOther large municipalities in the canton of Zurich
More data for Höri
- Parcels and building zones Höri in geopool
- Building zones and density Höri in room
- Points of interest and accessibility Höri in scoore
- Tax rates Höri in taxoo
- Solar potential Höri in soolar