Building age in Hittnau
Municipality in the canton of Zurich · FSO no. 173
Building register (GWR) export of September 2026, parcel data of July 2025.
Key figures
- Parcels with a building
- 1’040
- 1’031 of them with a known construction year
- Median construction year
- 1988Canton: 1977Switzerland: 1976
- Median building age
- 38 yearsCanton: 49 yearsSwitzerland: 50 years
- Built 1960 or earlier
- 25.9%Canton: 34.9%Switzerland: 32.5%
- Built after 2000
- 26.7%Canton: 21.4%Switzerland: 23.3%
About the building stock in Hittnau
The parcel data lists 1’040 parcels with a building in Hittnau. For 1’031 of them (99.1%) the federal building register (GWR) gives a construction year, taken from the newest building on the parcel. The median construction year is 1988, so the median parcel with a building is 38 years old. 25.9% of the parcels with a known year were built in 1960 or earlier and 26.7% after 2000. The largest period is 1981-2000 with 39.0%. For comparison, the median construction year is 1977 in the canton of Zurich and 1976 in Switzerland. 9 parcels with a building have no usable construction year and are left out of the shares.
Construction-year histogram
Parcels with a building by construction period, as a share of the 1’031 parcels with a known year. The periods are not equally long, so read the bars as shares of the stock, not as building activity per year.
- 18.9%before 1920: 18.9%, 195 parcels
- 2.8%1920-1945: 2.8%, 29 parcels
- 4.2%1946-1960: 4.2%, 43 parcels
- 8.4%1961-1980: 8.4%, 87 parcels
- 39.0%1981-2000: 39.0%, 402 parcels
- 13.9%2001-2010: 13.9%, 143 parcels
- 10.0%2011-2020: 10.0%, 103 parcels
- 2.8%2021 and later: 2.8%, 29 parcels
Building age distribution
The same parcels grouped by the age of their newest building in 2026.
- 66 years or older (built 1960 or earlier)25.9%267 parcels
- 46 to 65 years (built 1961-1980)8.4%87 parcels
- 26 to 45 years (built 1981-2000)39.0%402 parcels
- Up to 25 years (built 2001 or later)26.7%275 parcels
How to read these figures
The parcel data links every parcel to the federal building register (GWR). A parcel counts once, with the construction year of its newest building. Where the register gives only a construction period, the middle of the period is used.
The figures count parcels with a building, not individual buildings. A parcel with several buildings counts once, and a parcel without a building is not counted.
Building age is 2026 minus the construction year. Every share divides by the parcels with a known construction year.
See it on the map
roots colors every parcel by construction year, from deep red for the oldest buildings to pale cream for the newest.
Open the roots map in HittnauOther large municipalities in the canton of Zurich
More data for Hittnau
- Parcels and building zones Hittnau in geopool
- Building zones and density Hittnau in room
- Points of interest and accessibility Hittnau in scoore
- Tax rates Hittnau in taxoo
- Solar potential Hittnau in soolar